800 853 2236      lens   
Self-Supporting Towers

GPT Dakota Towers Pre-engineered RISA tower catalog drawings presented below. Scroll down this page. Personnel man rated towers. 20′ long solid rod welded tower sections shorten tower installation time & minimizes tower maintenance costs.

 - Self Supporting Tower Section Catalog Drawing

$0.00
Add to quote Quote now Update Continue shopping

Optional Items:

    - 12 Anchor base bolts.

    - Direct Embedment Section, also known by its abbreviation: “DES”.

    - EIA grounding system kit. Three 5/8″ x 8′ copperweld grd rods, rod clamps, #2 tinned ground wire & tinned lugs.

    - Positioning anchorages at tower top for climber workers.

    - Fall arrest climber system with 3/8″ strand wire.

    - Worker platforms.

    - 12″ long aluminum lightning rod.

    - PE stamped foundation & tower structure drawings.

    - Tower top mounting pipe. Different OD’s & lengths available.

    - Side mount antenna support brackets. stand-off lengths: 2′, 3′, 4′ or 6′ long.

Self-Supporting
 
 - Towers
   - Heights
   - Widths

Self-Supporting Tower

Prices
 
 - Direct Embedment Section.
   - Sections Included.
   - Approx Weights.
   - EPA Loading

Catalog Tower Drawings Photos
20' self-supporting tower section.
- 18" width @ base
- 18" width @ top

$1,720.00  20' self-supporting tower.
- tower pn# DT/SST20'/18"

- One 20' tower Section H1.
- 400 lbs. section weight.
- 65 FT/2 EPA 80mph tower.

$675.00 DES-1 (direct embedment section)
- DES approx. wt 200 lbs.

GPT 20' self-supporting tower

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

 
40' of self-supporting tower sections.
- two 20' tower sections w/bolts.
- 24" width @ base
- 18" width @ top

$3,880.00 40' of self-supporing tower.
- tower pn# DT/SST40'/24"

- Two Sections H1 & H2.
- 900 lbs total sections wt.
- 60 FT/2 EPA 80mph tower.

$927.50 DES-2 (Direct Embedment Section)
- DES approx. wt 250 lbs.

GPT 40' self-supporting tower

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

 

 

GPTowers-50-SS-tower-on-ballast-tray-300x225

Ballast tray with 50' self-supporting tower

60' of self-supporting tower sections.
- Three 20' tower sections w/bolts.
- 30" width @ base
- 18" width @ top

$6,880.00  60' self-supporting tower.
- tower pn# DT/SST60'/30"

- Three Sections H1, H2 & H3.
- 1,600 lbs total sections wt.
- 55 FT/2 EPA 80mph tower.

$980.00 DES-3 (Direct Embedment Section)
- DES approx. wt 300lbs.

GPT 60' self-supporting tower

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

Ballast Tray Hand Calculations

20151001_160559-300x169

60' Self-supporting tower on ballast tray near Gillette WY 2016

20151001_124657-300x169

Ballast tray with 60' self-supporting microwave tower near Gillette WY

80' of self-supporting tower sections.
- Four 20' tower sections w/bolts.
- 36" width @ base
- 18" width @ top

$10,060.00 80' self-supporting tower.
- tower pn# DT/SST80'/36"

- Four Sections H1, H2, H3 & H4.
- 2,500 lbs total sections wt.
- 50 FT/2 EPA 80 mph no ice tower.

$1,277.50 DES-4 (Direct Embedment Section)
- DES approx. wt. 400lbs.

GPT 80' self-supporting tower

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

 

 

100' of self-supporting tower sections.

- Five 20' tower sections w/bolts.
- 42" width @ base
- 18" width @ top

$14,440.00 100' self-supporting tower.
- Tower pn# DT/SST100'/42"

- Five Sections H1, H2, H3, H4 & H5.
- 3,600 lbs total approx. sections wt.
- 45 FT/2 EPA 80mph tower.

$1,522.50 DES-5 (Direct Embedment Section)​
- DES approx. wt. 500lbs.

GPT 100' self-supporting 18 straight top Tower

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

Example - Pad and Pier Foundation Design Drawing.

Example Towers:

100 FT SS Tower 42" wide base. Mahnomen MNcounty.
Click here to see the Tower drawing.

100 feet tall SS Tower 42" to 18" Mahnomen MN county data
Click here to see the Tower drawing.

100ft-SS-179x300

100' Self-Supporting tower in electrical substation

120' of self-supporting tower sections.

- Six 20' tower sections w/bolts.
- 48" width @ base
- 18" width @ top

$19,920.00 120' self-supporting tower.
- Tower pn# DT/SST120'/48"

- Six Sections H1, H2, H3, H4, H5 & H6.
- 5000 lbs total approx. sections wt.
- 40 FT/2 EPA 80mph tower.

$2,222.50 DES-6 (Direct Embedment Section)​
- DES approx. wt. 600lbs.

GPT 120' self-supporting tower

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

Example - Pad and Pier Foundation Design Drawing.

 

120-SS-Two-Harbors-MN-225x300

120' self-supporting tower at Two Harbors MN

140' of self-supporting tower sections.

- Seven 20' tower sections w/bolts.
- 54" width @ base
- 18" width @ top

$26,340.00 140' self-supporting tower.
- Tower pn# DT/SST140'/54"

- Seven Sections H1, H2, H3, H4, H5, H6 & H7.
- 6,700 lbs. tower sections wt.
- 35 FT/2 EPA 75mph tower.

$2,607.50 DES-7 (Direct Embedment Section)
- DES approx. wt. 700 lbs.

GPT 140' self-supporting tower 

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

Example - Pad and Pier Foundation Design Drawing.

Click here to see the Structural Analysis Report

140-SS-tower-being-raised-at-oil-well-site-Sidney-MT-225x300

140' self-supporting tower going up at oil well site Sidney MT.

160' of self-supporting tower sections.

- Eight 20' tower sections & one 10' w/bolts.
- 54" width @ base
- 18" width @ top

$28,407.00 160' self-supporting tower.​
- Tower pn# DT/SST160'/54"

- Eight Sections H1, H2, H3, H4, H5, H6, H7 + 20' straight section
- 6,950.lbs. tower sections wt.
- 20 FT/2 EPA 70mph tower.

$2,607.50 DES-7 (Direct Embedment Section)
- DES approx. wt. 700 lbs.

160-ft-self-supporting-tower-54-to-12-tower

Click here to see the Tower drawing.

Click here to see the MAT SS Foundation Drawing.

Example - Pad and Pier Foundation Design Drawing.

 

 

 

Installation of Great Plains Towers Self Supporting Tower Foundation

Install-ss-foundation-02 Install-ss-foundation-03
Install-ss-foundation-01 Install-ss-foundation-04
Install-ss-foundation-07 Install-ss-foundation-05
Install-ss-foundation-06  

 

Erecting Self Supporting Towers

 
erecting-ss-towers-01 erecting-ss-towers-02
erecting-ss-towers-03 erecting-ss-towers-04
   
   
   
   
   
   
   
   
   
   
   
   
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40' SS tower on ballast tray. Gillette WY. Anadarko

 

 

50' SS Tower - US Navy Midway Research Center, Welcome MD

 

100' SS Tower - BNSF Sidney MT

 

 

100' SS Tower - Crosby, ND

   

 

100' SS Tower - Fortuna ND - US Radar Base

 

 

100' SS Tower - Passadumkeag Maine

 

 

100' SS Tower - Westby MT

   

100' SS Tower - Wireless Internet Tribal Tower, Mahnomen MN

 
   

140' SS Tower - Buffalo Cole Oil Well head site - Sidney MT

 

140' SS Tower - Fairview MT

 
   
How Can We Help You?

Contact us with any questions - info@greatplainstowers.com 

We would be happy to answer your questions and set up a meeting with you.

 Great Plains Towers
                  126 Sixth Street West
                  West Fargo, North Dakota 58078
 
701 282 2236 ,  800 853 2236
 
 
 
Enter your name
Enter email address
Enter Phone number
Enter your message